No Nama Peserta K SK SB B A T ST P PT HN H SH SA P PK Alasan
1 CV. AXIAL HIGHWAY ENGINEERING CONSULTANT - 02.971.067.0-101.000 80,0 80,0 70,8 Rp. 305.855.000,00
Rp. 305.855.000,00
20,0 90,8
2 CV. KARYA CREATIF CONSULTANT - 03.286.556.0-101.000 85,0 85,0 72,8 Rp. 335.335.000,00
Rp. 335.335.000,00
18,24 91,04
3 CV. DIY & Crafts Engineering - 83.772.102.6-107.000 85,0 85,0 76,0 Rp. 336.886.000,00
Rp. 336.886.000,00
18,16 94,16
4 CV. CEUDAH CONSULTANT - 01.658.338.7-101.000 80,0 80,0
5 CV. KARYA BRATA DESIGN - 03.030.461.2-104.000 60,0 60,0
6 CV TANJONG RAYA CONSULTANT - 83.814.643.9-103.000 60,0 60,0
7 CV. ARL Consultant - 74.577.096.6-101.000 60,0 60,0
8 CV NADHIFA CONSULTANT - 84.604.541.7-107.000 65,0 65,0
9 CV. PENA SEJATI CONSULTANT - 02.829.358.7-102.000 45,0 45,0
10 CV. MANDIRI DESIGN - 72.344.105.1-107.000 65,0 65,0
11 CV. MAULANA CONSULTANT - 01.657.878.3-101.000 55,0 55,0
12 CV. BATOR ACEH CONSULTANT - 72.356.091.8-101.000
13 DUBAI ENGINEER - 84.014.132.9-101.000
14 PT. KLAPERON REKA CIPTA - 83.741.296.4-101.000
15 CV. PROFESTAMA PLAN - 02.503.098.2-101.000
16 UJUENG RAJA PERKASA - 02.907.669.2-107.000
17 CV. TIRAYA ABADI CONSULTANT - 86.706.247.3-107.000
18 ar jaya consultant - 74.574.311.2-102.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • HN Hasil Negosiasi
  • SH Skor Harga
  • SA Skor Akhir
  • B Pembuktian Kualifikasi
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak